projects
The following is a list of projects USI has been involved
in since incorporation.
- Hibernia Management and Development Company: Hibernia GBS platform
- Petro-Canada: Terra Nova FPSO
- Husky Energy: White Rose Project (FPSO)
- North Atlantic Refining Ltd: Structural lifting
- Newfoundland Transshipment Ltd: Terminal Modifications
- Transocean: Henry Goodrich MODU - Terra Nova Field
- Noble Drilling: Hibernia drilling systems
- KBR Production Services: Hibernia GBS Platform and Terra Nova FPSO
- Aker Maritime Keiwit Contractors: White Rose Topsides Project
- Amec (ExxonMobil Canada): Sable Tier II Project
- Technip Offshore Canada Ltd.: White Rose Subsea Project (FPSO)
- North Eastern Constructors Ltd.: White Rose Topsides Project (FPSO), Voisey's Bay Nickle Ship Unloader
- Marine CNG: Compressed Natural Gas pilot project
Below describes our involvement on the three major local offshore
projects:
HIBERNIA PLATFORM (GBS)
- Project management and technical support for numerous modifications
projects.
- Electrical systems engineering support to Noble Drilling.
- Topsides Upgrade.
- GBS Slot Additions.
- Project management and technical support to the Hibernia
EPCM contractor (Production Services Network).
TERRA NOVA PLATFORM (FPSO)
- Support to Petro-Canada and the Terra Nova FPSO asset in the
transition from start-up to steady state operations.
- Development and implementation of a modifications
management system and turnaround procedures for Petro-Canada use on the FPSO.
- USI personnel
played a key role in the successful execution of the Platform’s first turnaround
in 2002 and managed the offshore support team for the 2003 turnaround. This involvement
continued in the 2005 turnaround as well as the Drydock Turnaround for 2006.
- USI personnel are currently
playing roles in the planning, project management and construction management of Terra
Nova’s
most challenging capital projects including the recent Additional Living Quarters (ALQ)
Project.
- USI
is supporting steady state maintenance operations including electrical and hydraulics systems
and has supported Petro-Canada with Control Systems, Loss Control, Mechanical and Structural
engineering.
- Henry Goodrich MODU – project management support for Piping
and structural drilling modifications for the Terra Nova field drilling operations.
WHITE ROSE PROJECT (FPSO)
- USI has provided both project management and technical support
to Newfoundland’s third offshore project.
- USI provided management for the design, installation & hook-up
of the Turret. We also performed lead roles in the Integrated Control Systems contract,
Interface Management, offshore hook-up, construction management, engineering support and
project controls.
- USI
has provided personnel for factory acceptance testing as the Owners representative for
packaged equipment.
- USI has provided HAZOP/HAZID facilitation for major contracts scope
and field installation activities.
- USI provided technical assistance to White Rose topsides
fabricator NECL in the form of fabrication sequence documents, layout and sea transportation
consultancy and structural lifting.
- Engineering support to Aker Maritime Kiewit Contractors
during the White Rose Topsides installation, start up and commissioning phase of the project.
- Structural
engineering and drafting of seafastenings for the White Rose Subsea development installation
program.
- Support to North Eastern Constructors Ltd for project structural
engineering support of the M12 Module.
|